Friday, October 28th ~ Tagus Cove, Urbina Bay, Isabela Island

Darwin Lake
Day 3 ~ Before we take off on todays excursions, I wanted to share more information of what day-to-day life is like on board the Santa Cruz II. There are several primary large areas where meetings, or lectures, or meals can be served, the Panorama Bar, Rear Sun Deck, Library and the Dining Room.

Library, also used for coffee bar, snack station, and daily briefings in Spanish

Dining Room – Breakfast and lunch are buffet, but dinner is served from menu
At lunchtime each day, we review the menu of dinner offerings and place our order so the chef knows how many of each dish to prepare. Less waste as only what is needed is prepared.

Sample of one days dinner choices

This was the fish dish

Long hallways with nautical carpeting
The daily schedule is posted on each deck so that we know what is planned, whether it is a wet or dry landing, and any options we may need to sign up for in advance.

What was planned for today
A map is also displayed on these boards showing how far we have traveled and where we will be each day.

This shows the distance traveled and stops made on the first three days
Did you notice that Isabel Island is in the shape of a sea-horse?
And pictures are posted to show us the primary “Big 15” animals/birds/reptiles we will be looking for that day.

Pictures of what will be looking for today
I already shared a picture of our cabin and bathroom on day 1.
When our group is announced to depart the ship, we already have our life vests on. Moving to the aft of the boat, we place a red magnet over our cabin room number (one for each person in that cabin) so that the crew always knows who is on board and who is on shore.

Our in and out board. Everyone was on board when this was taken so no red magnets shown.

This is the rear of the boat where the panga boats (zodiac) are stored.

Back of the ship where panga boats load and unload each day
Our plans for the morning include a panga ride and landing at Tagus Cove on the northwest part of Isabela Island. This was a favorite anchorage for pirates and whalers over the centuries.

Sadly years ago before protection measures were put in place, visitors left their mark

Hiking trails are uphill, but not too rugged
An uphill hike brought us to the rim of the crater and to Darwin Lake, filled with salt water. This was a spectacular vista point with the colorful lake and ocean with our ship in the background.

Tim, Joanne, Rica and Fred in front of Darwin Lake
After our walk, the panga hugged the shoreline to spot more of the local wildlife.

Along the rocky coastline

Brown Pelican
We next had the choice of open water snorkeling or glass bottom boat ride. We choose second option. Unfortunately the water was stirred up and murky, so we saw little other than several green sea turtles and chocolate chip starfish.
All of this was before lunch!
We had planned on going snorkeling in the afternoon from the beach at Urbina Bay, but after seeing how unclear the water was today, we chose to stay on board and just go on the late afternoon hike.
Urbina Bay, is the fascinating result of an uplifting of the ocean floor in 1954. The beach was made up of corals, shells and other calcareous organisms exposed above water.
The walk was easy and mostly flat this afternoon.

This is the terrain where we walked
And what about the vegetation? Yes, we did see the occasional flower, seed or fruit pod, but they were not in abundance. Here is a sampling of what we found. Sorry, I have not identified each one.
This area is also home to the large and colorful Galápagos land iguanas and occasionally to giant tortoises. We were fortunate (once again) to see both of them.

Colorful Land Iguana

Our first Giant Galapagos Tortoise – this is a relatively young one (maybe 20-30 years)
These tortoise can live up to 150 years it has been estimated.
Last ones off the island just before sunset. This shows the beach area where some of the group snorkels from.

Shoreline made of shells and coral – wet landing
We were welcomed back on board to watch the sunset and a surprise BBQ happy hour complete with Sangria on the rear Panorama Deck.
After another sumptuous dinner, a guest scientist, Gabriella, gave a lecture on how the weather patterns (El Nino and La Nina) affect evolution. Tim is once again struggling with dietary allergy reactions and not feeling great, so he opted for an early evening, but I found the talk of interest.
GRATITUDE MOMENT: Today I am grateful for how well-organized the ship and activities are. Things run smoothly, there are always steady hands to assist getting on/off the moving panga boats. Meals are tasty and varied. There are always some options each day for more or less adventurous passengers. They run a well-oiled machine.
We hope you are enjoying seeing what our Galapagos Expedition is like. We have two more full days to go. Please join us!


Wow! Lucky you! Have fun!
LikeLiked by 1 person
We are indeed!
LikeLiked by 1 person
Sounds like you are having a great time ☺
LikeLiked by 1 person
Yes! A unique and fascinating journey.
LikeLiked by 1 person
Another great post and photos 🙂
LikeLike
Thanks Elaine!
LikeLiked by 1 person
Your pictures about your daily agenda and timings reminded me of what I do to cope. Sent you an email !
LikeLike
Asif, thank you for your message. The difference is remakable. I tried to find the app you mentioned and came up with a long list. I need to narrow it down as that is one I could definitely use.
LikeLike
I remember you having an iPhone, but I could be mistaken. Links for both iphone and android devices follow:
Office Lens for the iphone:
https://itunes.apple.com/us/app/office-lens/id975925059?mt=8
Office lens for the android:
https://play.google.com/store/apps/details?id=com.microsoft.office.officelens&hl=en
LikeLike
iPhone it is. Thank you for sending this. I will get it installed this evening.
LikeLike
I tried posting the links to the apps here, but they disappeared. Must be a WordPress(?) oddity.. In any case, I also sent them via email.
LikeLike
A very nice piece to get me thinking about heading to the Galapagos!
LikeLike
I can not imagine anyone not finding the Galápagos Islands fascinating. Go!
LikeLike
We couldn’t have a better armchair ride. Thanks
LikeLike
Haha, I pictured you on one side of my chair and Daryl on the other. Made me chuckle!
LikeLike
Hello! We are in the Galapagos now also. We are on Isabela for one more night and then in Puerta Ayora for four nights. If you ever have free time on your busy schedule, please let me know. I would love to meet you in person!
LikeLike
Oh I wish we did but we have already left the Islands. My posts are a few days behind. Sure hope you are loving your trip as much as we did ours. Pretty awesome place isn’t it?!?!
LikeLiked by 1 person
I love all your photos and your adventure! So fun. 🙂
LikeLike
Thank you Kathy.
LikeLiked by 1 person
Wonderful photos it looks like an outstanding adventure. I am jealous, HAHA. You 2 have fun.
LikeLiked by 1 person
Fun it is!
LikeLiked by 1 person
Fabulous photos. Some are dark brown on the blog with no picture. Perhaps it’s just me.
LikeLike
Maria, those are slide shows. Perhaps you have not updated your system to have the current Flash system installed?
LikeLiked by 1 person
More than likely. Will suss it out. Love your photos.
LikeLike
Beautiful tour of the island.
LikeLike
Glad you joined us!
LikeLike
Great! These posts are bringing back memories for me of our trip way back in 1999.
LikeLike
With the protection measures now in place, I’m guessing that it was not changed much since you were there in 1999.
LikeLiked by 1 person
Seems like a rigorous schedule but you seemed to manage it well.
LikeLike
They do keep you busy, but only if you want to. If you chose to simply sit on deck and soak up the sunshine and a beverage, that is OK too. We wanted to see as many of the animals as we possibly could, so off we went at every opportunity.
LikeLike
Wonderful adventure. Great post!
LikeLike
Thank you Belinda and welcome!
LikeLiked by 1 person
I just love your picture quality and photographic skill!
LikeLike
Thank you so much for that sweet compliment.
LikeLiked by 1 person
Pingback: Galapagos Islands, Ecuador ~ Tagus Cove, Urbina Bay — A Note From Abroad | The Love Chronicles
What an amazing journey and you’ve captured some wonderful photos of the wildlife! 😀
LikeLike
It is a bit easier to photograph them when they have no fear of you and just sit still and pose 😃
LikeLiked by 1 person
great post! thank you for taking us with you! i hope that the food sensitivities are past… something ‘jumped’ on me last weekend, and after a few days of purging, i was lucky to end it via a strong guava-leaf tea… not sure if there are any guava trees there on the islands…
lisa
LikeLike
Lisa, it was pretty miserable for him for several days. I am not familiar with guava leaf tea, but will need to do a bit of research on it. Thanks for the suggestion for the future.
LikeLike
i sent this link to a friend this past week.. http://www.medicaldaily.com/6-health-benefits-guava-leaves-treating-diarrhea-cancer-353666
and here’s another
http://www.healthdigezt.com/17-amazing-benefits-of-guava-leaves-for-skin-hair-and-health/
i learned about it a long time ago when a friend was ‘sick’ and there was no way to get to a pharmacy.. the info came from the book, 100 Healing Herbs of Belize… since then, i’ve witnessed its magic on at least a dozen people, many of them suffering w/nothing working… i read tthat the n. american indians used crepe myrtle for the same reasons, and crepe myrtle and guava are cousins!
LikeLike
Thanks for sending this information. I will need to research it.
LikeLiked by 1 person